Wednesday, November 28, 2007

Second Home 2nd Floor Forming


Our Second Home is moving right along as well. With the first floor walls and columns all formed up, the crew has begun work on the second floor. Rumor has it they will construct a temporary roof over the entire floor (you can see where it has been started) to keep out snow and ice, two variables unacceptable in concrete construction. We are on schedule for our concrete pour, and I will have that posted with a possible steel work post in between.