Second Home 1st Floor Slab Pour
It`s beginning to look a lot like Christmas here in Furano. The snow refused to let up as we poured another 100 cubic meters into the foundation at Home Number Two. With a thickness of 30 centimeters, the slab should be plenty strong to hold up the rest of the building and to withstand any force that Mother Nature throws at it.
The carpenters and steel crew will be back tomorrow to start forming the columns and exterior walls. Word is the second floor slab will be poured (scheduled for December 29th) in conjunction with the walls and columns, so I expect a fairly large quantity of concrete will run through the proposed two pumps at the job site. By that time, winter will be in full swing, and there is talk of covering the entire job site with a tent. Let it snow, let it snow.