Monday, October 22, 2007

First Home Framing

The first floor walls and second story floor framing are complete at Home One. After the prefabbed walls are dropped at the site, a portable crane drives to the job and lifts everything into place. This time around, the completed garage and overhead power lines provided a bit of a challenge for the crane driver. Yet, as always, the Japanese pulled for the team and good progress is being made. Nobody even got electrocuted!
Furano, Hokkaido, Japan. Ski, snowboard, enjoy.
www.furanorealestate.jp

No comments: